Contact Us

Tel:+86-510-88990983

Fax:+86-510-88990983

Mob:+8615861560932

E-mail:wxsxjinyan@163.com  

E-mail:lweisx@163.com  

Add:Houzhai Middle Road 156#, Hongshsan Town, New District, Wuxi, Jiangsu, China

3 Roll Calender Machine

3 Roll Calender Machine

Application: Process rubber sheet, adhibit rubber, rub rubber etc. Features: Each machine is composed of such main parts as: bed, drilled rolls, gear reducers, the grease lubrication system, gap control mechanism (electric), emergency stop device, etc.

Inquiry

  • Product Details

Application:

Process rubber sheet, adhibit rubber, rub rubber etc.

Features:

Each machine is composed of such main parts as: bed, drilled rolls, gear reducers, the grease lubrication system, gap control mechanism (electric), emergency stop device, etc.

Specification

Roll dia.

(mm)

Mid-roll liner speed(m/min)

Min. Thickness of the   product

(mm)

Calendering width

(mm)

Motor power

(KW)

Overall   dimension

(LxWxH)

(mm)

Weight

(T)

XY-3I(F)1120

360x1120

2-20

=0.20

900

40

6050x1660x2330

11.6

XY-3I(F)1400

400x1400

2.5-25

=0.20

1200

55

5600x1410x2385

15

XY-3I(F)1450

450x1450

2.5-25

=0.20

1225

75

5850x1920x2870

25

XY-3I(F)1600

510x1600

2.5-25

=0.20

800

110

6025x3300x3800

30

XY-3I(F)1730

610x1730

4.5-45

=0.20

800

160

6025x3300x3800

33

XY-3I(F)2540

820x2540

3-30

=0.20

2200

160x3

10195x3340x5820

133

XY-3I(F)3400

900x3400

3-30

=0.20

3100

220x3

7900x4500x5680

150


Commercial terms

1. Payment: 30% by T/T as advance payment, balance(70%) by T/T before shipment

2. Lead Time: 120 days after receiving the advance payment

3. Transportation: container, simple package ( PE film, salver)

4.Warranty period: From the day of the use of the machine in the buyer’s factory:

   (1) The mechanical Parts: 12 months

   (2) The electrical Parts: 6 months

5. Installations and Commissioning

   (1) Up to date commissioning has been made before shipment

   (2) Overseas Commissioning and charges one or two technicians will be sent to the buyer to guide the 

   installation and commissioning of the equipment if the customer requests.

  Customers pay the charge of our technicians.

   (1) Round-trip Airplane Ticket

   (2) Charges of transportation, accommodation and communication

   (3) The allowance for the technicians is USD 80 per day for one person.

   (4) An interpreter is needed.

6. Spare parts:

   Spare parts for one year are needed for the customers, and we suggest that customers should buy the      spare parts. (Fittings list will be provided.)

7. English manual, Figuration drawing, and footing drawings are provided.


  • Feedback